Cisco ONS 15454 Series Procedure Manual page 48

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Document Organization
Table 1
Title
Chapter 8, "Monitor Performance"
Chapter 9, "Manage Circuits"
Chapter 11, "Change Card Settings"
Chapter 11, "Change Card Settings"
Chapter 12, "Upgrade Cards and Spans"
Chapter 13, "Convert Network Configurations"
Chapter 14, "Add and Remove Nodes"
Chapter 15, "Maintain the Node"
Chapter 16, "Power Down the Node"
Chapter 17, "DLPs A1 to A99"
Chapter 18, "DLPs A100 to A199"
Chapter 19, "DLPs A200 to A299"
Cisco ONS 15454 Procedure Guide, R5.0
xlviii
Cisco ONS 15454 Procedure Guide Chapters (continued)
Summary
Includes procedures to change the performance
monitoring (PM) display, monitor performance,
and manage remote monitoring (RMON)
thresholds.
Includes procedures to view circuits and
cross-connect resource usage, modify and delete
circuits and tunnels, convert and upgrade CTC and
TL1 circuits, monitor circuits, and create a J1 path
trace.
Includes procedures to change node management
information, CTC network access and view, and
DWDM node settings; change or delete card
protection settings; delete SONET data
communication channel (DCC), line data
communication channel (LDCC), generic
communication channel (GCC), and DWDM
optical service channel (OSC) terminations; and
change node timing, security, and Simple Network
Management Protocol (SNMP).
Includes procedures to modify line settings and
PM parameter thresholds for cards, modify alarm
interface controller settings, and upgrade DS-1 and
DS-3 1:1 protection to 1:N protection.
Includes procedures to prevent an OC-N protection
switch during cross-connect upgrades, upgrade or
downgrade cards, and upgrade spans automatically
or manually.
Includes procedures to convert network
configurations, modify a BLSR, and manage
BLSR switches.
Includes procedures to add or remove BLSR, path
protection, or linear nodes from a network
configuration.
Includes procedures to inspect and manage the air
filter, backup and restore the database, restore the
node to factory configuration, off load the security
audit trail log, inhibit card protection switching,
revert software, clean fiber connectors, reset the
TCC2 card using CTC, view Ethernet card
maintenance information, change the node timing
reference, and view the timing report.
Includes the procedure to power down the node.
Includes all current tasks (DLPs) from A1 to A99.
Includes all current tasks from A100 to A199.
Includes all current tasks from A200 to A299.
About this Guide
December 2004

Advertisement

Table of Contents
loading

Table of Contents