NTP-A191 Create an E-Series EtherSwitch Circuit (Multicard or Single-Card Mode)
In the Circuits window, verify that the new circuits appear in the circuits list.
Step 12
Complete the
Step 13
Circuits" procedure on page
Stop. You have completed this procedure.
NTP-A191 Create an E-Series EtherSwitch Circuit (Multicard or
Single-Card Mode)
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
EtherSwitch circuit. If you are already logged in, continue with
If a high number of VLANs is already used by the network, complete the
Step 2
Available VLANs" task on page 17-99
create a VLAN during each circuit creation task.)
If enough VLANs are not available, complete the
Step 3
free space.
Verify that the circuit source and destination Ethernet cards are provisioned for the mode of the circuit
Step 4
you will create, either multicard or single-card. See the
Mode" task on page
Provision and enable the Ethernet ports. See
Step 5
page
Step 6
From the View menu, choose Go to Network View.
Click the Circuits tab, then click Create.
Step 7
Cisco ONS 15454 Procedure Guide, R5.0
6-56
If you entered more than 1 in the Number of Circuits field and selected Auto-ranged, CTC
automatically creates the number of circuits entered in Number of Circuits. If auto-ranging cannot
complete all the circuits, for example, because sequential ports are unavailable at the source or
destination, a dialog box appears. Set the new source or destination for the remaining circuits, then
click Finish to continue auto-ranging. After completing the circuits, the Circuits window appears.
If you entered more than 1 in the Number of Circuits field and did not choose Auto-ranged, the
Circuit Creation dialog box appears so you can create the remaining circuits. Repeat Steps
through
10
for each additional circuit. After completing the circuits, the Circuits window appears.
"NTP-A135 Test Electrical Circuits" procedure on page 6-36
6-51, as applicable. Skip this step if you built a test circuit.
This procedure creates a multicard or single-card EtherSwitch circuit. It
does not apply to E-Series cards in port-mapped mode. To create a
port-mapped mode circuit, see
Card in Port-Mapped Mode, page
E-Series Ethernet cards (E100T-12/E100T-G, E1000-2/E1000-2-G) must
be installed at each end of the Ethernet circuit.
NTP-A127 Verify Network Turn Up, page 6-4
As needed
Onsite or remote
Provisioning or higher
"DLP-A60 Log into CTC" task on page 17-66
19-29.
19-13.
NTP-A192 Create a Circuit for an E-Series
6-59.
at the node where you will create the
Step
to verify that sufficient VLAN capacity is available. (You will
"DLP-A335 Delete VLANs" task on page 20-23
"DLP-A246 Provision E-Series Ethernet Card
"DLP-A220 Provision E-Series Ethernet Ports" task on
Chapter 6
Create Circuits and VT Tunnels
or the
"NTP-A62 Test OC-N
2.
"DLP-A99 Determine
August 2005
5
to

Advertisement