NTP-A24 Verify Card Installation
NTP-A24 Verify Card Installation
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Verify that two TCC2/TCC2P cards are installed in Slots 7 and 11.
Step 1
Verify that the green ACT (active) LED is illuminated on one TCC2/TCC2P card and the amber STBY
Step 2
(standby) LED is illuminated on the second TCC2/TCC2P card.
Note
Step 3
Verify that cross-connect cards (XCVT or XC10G) are installed in Slots 8 and 10. The cross-connect
cards must be the same type.
Step 4
Verify that the green ACT (active) LED is illuminated on one cross-connect card and the amber STBY
(standby) LED is illuminated on the second cross-connect card.
Note
If your site plan requires an Alarm Interface Controller (AIC) or Alarm Interface
Step 5
Controller-International (AIC-I) card, verify that the AIC/AIC-I card is installed in Slot 9 and its ACT
(active) LED displays a solid green light.
Verify that electrical cards (DS-1, DS-3, EC-1, and DS3XM) are installed in Slots 1 to 6 or 12 to 17 as
Step 6
designated by your installation plan.
If your site plan requires an Ethernet card, verify that the Ethernet card is installed in the specified slot
Step 7
and its ACT (active) LED displays a solid green light:
Cisco ONS 15454 Procedure Guide, R5.0
4-2
This procedure verifies that an ONS 15454 node provisioned for SONET
is ready for turn-up.
An engineering work order, site plan, or other document specifying the
ONS 15454 card installation.
Chapter 1, "Install the Shelf and Backplane Cable"
Chapter 2, "Install Cards and Fiber-Optic Cable"
Required
Onsite
Retrieve or higher
If the TCC2/TCC2P cards are not installed, or if their LEDs are not operating as described, do
not proceed. Repeat the
to the Cisco ONS 15454 Troubleshooting Guide to resolve installation problems before
proceeding to
Step
3.
If the cross-connect cards are not installed, or if their LEDs are not operating as described, do
not proceed. Repeat the
refer to the Cisco ONS 15454 Troubleshooting Guide to resolve installation problems before
proceeding to
Step
5.
The E100T-12, E100T-12-G, E1000-2, and E1000-2-G cards are installed in Slots 1 to 6 or 12 to 17
The G1000-4 cards are installed in Slots 1 to 4 or 14 to 17.
The G1K-4, ML1000-2, and ML100T-12 cards can be installed in Slots 1 to 6 or 12 to 17 if an
XC10G cross-connect is installed. However, they must be installed in Slots 5, 6, 12, or 13 if XC or
XCVT cards are installed.
"DLP-A36 Install the TCC2/TCC2P Cards" task on page
"DLP-A37 Install the XCVT or XC10G Cards" task on page
Chapter 4
Turn Up Node
17-42, or refer
17-45, or