Ntp- A312 Add A Node To A Linear Adm Using The Wizard - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

NTP-A312 Add a Node to a Linear ADM Using the Wizard
Complete the
Step 6
to the new node. If you are already logged in, continue with
Complete the
Step 7
Install the OC-N cards that will connect to the new node. See the
Step 8
procedure on page
Connect the working card at the existing linear ADM node to the working card at the new node. See the
Step 9
"DLP-A428 Install Fiber-Optic Cables in a 1+1 Configuration" task on page
Connect the protect card at the existing linear ADM node to the protect card at the new node.
Step 10
Complete the
Step 11
that connect to the new node.
Complete the
Step 12
OC-N card that connects to the working card on the new node. Make sure to set the port service state in
the Create SDCC Termination dialog box to IS. (Do not create a DCC termination for the protect card.)
From the View menu, choose Go to Network View. Verify that the newly created linear ADM
Step 13
configuration is correct. Two green span lines should appear between each linear node.
Complete the
Step 14
that no unexpected alarms or conditions are present.
Stop. You have completed this procedure.
NTP-A312 Add a Node to a Linear ADM Using the Wizard
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
OC-N transmit and receive levels should be in their acceptable range as shown in the specifications for
Note
each card in
If overhead circuits exist on the network, an In-Service Topology Upgrade is service affecting. The
Note
overhead circuits will drop traffic and have a status of PARTIAL after the upgrade is complete.
Cisco ONS 15454 Procedure Guide, R5.0
14-14
"DLP-A60 Log into CTC" task on page 17-66
"DLP-A298 Check the Network for Alarms and Conditions" task on page
2-6. If the cards are already installed, continue with
"DLP-A73 Create a 1+1 Protection Group" task on page 17-81
"DLP-A377 Provision Section DCC Terminations" task on page 20-61
"DLP-A298 Check the Network for Alarms and Conditions" task on page 19-63
This procedure adds a node between two nodes in a 1+1 protection group
without losing traffic.
Compatible hardware necessary for the upgrade (for example, XC10G,
XCVT, or XC10G cards and OC-48 any slot [AS] cards)
Attenuators might be needed for some applications.
The in-service topology upgrade procedure requires that the node to be
added is reachable (has IP connectivity with CTC). Two technicians who
can communicate with each other during the upgrade might be needed if
the PC running CTC and the ONS 15454s are not at the same location.
As needed
Onsite
Provisioning or higher
Table 2-3 on page
2-15.
Chapter 14
Add and Remove Nodes
at the linear ADM node that will connect
Step
7.
"NTP-A16 Install the OC-N Cards"
Step
9.
21-8.
for the two OC-N cards
for the working
19-63.
to verify
December 2004

Advertisement

Table of Contents
loading

Table of Contents