Dlp- A5 Mount The Shelf Assembly In A Rack (One Person) - Cisco ONS 15454 Series Procedure Manual

Hide thumbs Also See for ONS 15454 Series:
Table of Contents

Advertisement

Chapter 17
DLPs A1 to A99
Figure 17-2
Slide the air filter into the shelf assembly.
Step 4
Return to your originating procedure (NTP).
Step 5
DLP-A5 Mount the Shelf Assembly in a Rack (One Person)
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Verify that the proper fuse and alarm panel has been installed in the top mounting space. If a fuse and
alarm panel has not been installed, you must install one according to the manufacturer's instructions.
March 2005
Installing the External Brackets
This task allows one person to mount the shelf assembly in a rack.
Pinned hex tool
Two set screws (48-1003-XX)
Eight pan-head Phillips mounting screws (48-1004-XX, 48-1007-XX)
#2 Phillips screwdriver
DLP-A3 Reverse the Mounting Bracket to Fit a 19-inch (482.6 mm) Rack,
page
DLP-A4 Install the External Brackets and Air Filter, page
applicable
As needed
Onsite
None
If you are installing the 15454-SA-ANSI or 15454-SA-HD shelf assembly, a 100-A fuse panel
(30-A fuse per shelf minimum) is required.
If you are installing the 15454-SA-NEBS3 shelf assembly, a standard 80-A fuse panel (20-A fuse
per shelf minimum) is required.
DLP-A5 Mount the Shelf Assembly in a Rack (One Person)
17-2, if applicable
Cisco ONS 15454 Procedure Guide, R5.0
17-4, if
17-5

Advertisement

Table of Contents
loading

Table of Contents