Tools Needed - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Required Tools and Equipment

Tools Needed

The following tools are needed to complete the procedures in this chapter:
Test Equipment
The following test equipment is needed to complete the procedures in this chapter:
In this chapter, the terms "ONS 15310-MA SDH" and "shelf assembly" are used interchangeably. In the
Note
installation context, these terms have the same meaning. Otherwise, shelf assembly refers to the physical
steel enclosure that holds cards and connects power, and ONS 15310-MA SDH refers to the entire
system, both hardware and software.
NTP-H149 Unpack and Inspect the ONS 15310-MA SDH Shelf
Assembly
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
1-4
User data channel (UDC) cable: EIA/TIA-232 port cable, CAT-5 terminated with RJ-45
Management LAN cable, CAT-5 terminated with RJ-45
Single-mode LC fiber jumpers with UPC polish (55 dB or better) for optical interfaces
E1 cabling, shielded, terminated to a 21-pair #26AWG cable, with dual 64-pin CHAMP connectors
at far end with separate transmit and receive, straight termination (optional)
Shielded coaxial cable terminated with BNC connectors for DS3/E3 ports
Tie wraps and/or lacing cord
Labels
#2 Phillips screw driver
Medium slot head screw driver
Small slot head screw driver
Wire cutters
Wire strippers
Volt meter
Power meter (for use with fiber optics only)
Bit error rate (BER) tester, E1 and DS3/E3
This procedure describes how to unpack the ONS 15310-MA SDH and
verify the contents.
None
Required
Onsite
None
Chapter 1
Install the Cisco ONS 15310-MA SDH
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents