Cisco ONS 15310-MA SDH Procedure Manual page 147

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Chapter 5
Create Circuits and VC Low-order Path Tunnels
Protected Drops—Check this check box if you want the circuit routed on protected drops only, that
is, to ports that are in 1+1 protection. If you check this check box, CTC displays only protected cards
and ports as source and destination choices.
If the circuit will be routed on a path protection configuration, complete the
Step 8
Protection Selectors During Circuit Creation" task on page
step.
Click Next.
Step 9
Complete the
Step 10
In the Circuit Routing Preferences area, uncheck Route Automatically.
Step 11
To set the circuit path protection, complete one of the following:
Step 12
To route the circuit on a protected path, leave Fully Protected Path checked and continue with
Step
and alternate paths), and the path diversity options apply only to path protection path segments, if
any exist.
To create an unprotected circuit, uncheck Fully Protected Path and continue with
If you selected Fully Protected Path in
Step 13
configuration, choose a Node-Diverse Path option:
Nodal Diversity Required—Ensures that the primary and alternate paths within the path protection
portions of the complete circuit path are nodally diverse.
Nodal Diversity Desired—Specifies that node diversity is preferred, but if node diversity is not
possible, CTC creates fiber-diverse paths for the path protection portion of the complete circuit path.
Link Diversity Only—Specifies that only fiber-diverse primary and alternate paths for path
protection portions of the complete circuit path are needed. The paths might be node-diverse, but
CTC does not check for node diversity.
If you selected Fully Protected Path in
Step 14
check the Dual Ring Interconnect check box.
If you are creating a VC high-order path circuit, skip this step and continue with
Step 15
creating a VC low-order path circuit, click Next and complete the
path and VC Low-order Path Grooming Nodes" task on page
Click Next. In the Route Review and Edit area, node icons appear for you to route the circuit. The circuit
Step 16
source node is selected. Green arrows pointing from the source node to other network nodes indicate
spans that are available for routing the circuit.
Complete the
Step 17
circuit that you are creating.
Step 18
Click Finish.
CTC compares your manually provisioned circuit route with the specified path diversity option you
chose in
error message and allows you to change the circuit path.
If you entered more than 1 in the Number of Circuits field, the Circuit Creation dialog box appears for
Step 19
you to create the remaining circuits. Repeat Steps
When all the circuits are created, the main Circuits window appears. Verify that the circuits you created
Step 20
are correct.
Complete the
Step 21
test circuit.
78-19416-01
"DLP-H58 Provision a E1 Circuit Source and Destination" task on page
13. Fully protected paths might or might not have path protection path segments (with primary
"DLP-H60 Provision a E1, DS-3, or E3 Circuit Route" task on page 16-78
Step
13. If the path does not meet the specified path diversity requirement, CTC displays an
"NTP-H46 Test Electrical Circuits" procedure on page
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-75. Otherwise, continue with the next
Step 12
and the circuit will be routed on a path protection
Step 12
and the circuit will be routed on a path protection DRI,
16-77.
5
through
18
for each additional circuit.
Before You Begin
"DLP-H57 Provision Path
16-76.
Step
Step
16. If you are
"DLP-H59 Provision VC high-order
for the E1
5-24. Skip this step if you built a
16.
5-11

Hide quick links:

Advertisement

Table of Contents