DLPs H1 to H99
Required/As Needed
Onsite/Remote
Security Level
Before you make any crimp connections, coat all bare conductors (battery, battery return, and frame
Caution
ground) with an appropriate antioxidant compound. Bring all unplated connectors, braided strap, and bus
bars to a bright finish, then coat with an antioxidant before you connect them. You do not need to prepare
tinned, solder-plated, or silver-plated connectors and other plated connection surfaces in this manner, but
always keep them clean and free of contaminants.
If you encounter problems with the power supply, refer to the Cisco ONS 15310-MA SDH
Note
Troubleshooting Guide.
Connect the office power according to the fuse panel engineering specifications.
Step 1
Measure and cut the cables as needed to reach the ONS 15310-MA SDH from the fuse panel.
Step 2
Strip away 0.2 inches of insulation at one end of two 14 AWG wires.
Step 3
Figure 16-4
Figure 16-4
Open the Molex crimping tool by squeezing the handles together. The ratchet mechanism will release
Step 4
the handles and the tool will open.
Place the terminal into the correct die profile A until it is stopped by the locator.
Step 5
Partially close the tool until the terminal is held in place.
Step 6
Place a wire into the terminal and align the wire with the conductor and insulation grips.
Step 7
Figure 16-5
78-19416-01
Required
Onsite
None
shows the stripped 14 AWG wires.
Insulation Stripped from Wires
Wire
Terminal
shows the location of conductor and insulation grips.