Install the Cisco ONS 15310-MA SDH

NTP-H164 Perform the Shelf Installation Acceptance Test

Purpose
Tools/Equipment
Prerequisite Procedures Applicable procedures in
Required/As Needed
Onsite/Remote
Security Level
Complete
Step 1
Table 1-3
Description
NTP-H149 Unpack and Inspect the ONS 15310-MA SDH Shelf Assembly, page 1-4
NTP-H150 Install the Shelf Assembly, page 1-5
NTP-H169 Install the Cable Management Bracket, page 1-6
NTP-H167 Install the EIAs, page 1-10
NTP-H151 Install the Power and Ground, page 1-12
NTP-H152 Install the Fan-Tray Assembly, page 1-14
NTP-H153 Install the 15310E-CTX-K9 Cards, page 1-16
NTP-H154 Install the Ethernet Cards, page 1-19
NTP-H155 Install the Electrical Cards, page 1-23
NTP-H156 Install the Filler Cards, page 1-25
NTP-H157 Install Wires to Alarm, Timing, Craft, LAN, and UDC Pin Connections,
page 1-26
NTP-H158 Install the Electrical Cables, page 1-27
NTP-H159 Install and Remove SFPs, page 1-28
NTP-H160 Install Optical Cables, page 1-29
Step 2
Check each wire and cable connection to make sure all cables are locked securely. If a wire or cable is
loose, return to the appropriate procedure in this chapter to correct it.
Step 3
Complete the
Stop. You have completed this procedure.
78-19416-01
Use this procedure to perform a shelf installation acceptance test.
Voltmeter
Required
Onsite
Retrieve or higher
Table 1-3 on page 1-31
by verifying that each procedure was completed.
ONS 15310-MA SDH Shelf Installation Task Summary
"DLP-H20 Measure Voltage" task on page
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
Required Tools and Equipment
Chapter 1, ""
16-25.
Completed
1-31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents