Chapter 1
Install the Shelf and Backplane Cable

User-Supplied Materials

The following materials and tools are required but are not supplied with the ONS 15454:

Tools Needed

March 2003
One or more of the following equipment racks:
19-inch (482.6 mm) rack; total width 22 inches (558.8 mm)
23-inch (584.2 mm) rack; total width 26 inches (660.4 mm)
Fuse panel
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper conductors, 194°F [90°C])
If you are installing power on a 15454-SA-NEBS3E, 15454-SA-NEBS3, or 15454-SA-R1,
Note
P/N: 800-07149 shelf assembly, a #12 to #14 AWG power cable is required.
Ground cable #6 AWG stranded
If you are installing power on a 15454-SA-NEBS3E, 15454-SA-NEBS3 or 15454-SA-R1,
Note
P/N: 800-07149 shelf assembly, the #14 AWG ground cable is required.
Alarm cable pairs for all alarm connections, #22 or #24 AWG (0.51 mm² or 0.64 mm²), solid tinned
100-ohm shielded Building Integrated Timing Supply (BITS) clock cable pair #22 or #24 AWG
(0.51 mm² or 0.64 mm²), twisted-pair T1-type
Single-mode SC fiber jumpers with UPC polish (55 dB or better) for optical (OC-N) cards
Shielded coaxial cable terminated with SMB or BNC connectors for DS-3 cards
Shielded ABAM cable terminated with AMP Champ connectors or unterminated for DS1N-14 cards
with #22 or #24 AWG (0.51 mm² or 0.64 mm²) ground wire (typically about two feet in length)
6-pair #29 AWG double-shielded cable
Tie wraps and/or lacing cord
Labels
Listed pressure terminal connectors such as ring and fork types; connectors must be suitable for
#10 AWG copper conductors
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
BNC insertion tool
Required Tools and Equipment