Chapter 1
Install the Cisco ONS 15310-MA SDH
Required Tools and Equipment
Figure 1-2
Installing the Extended Cable Management Bracket
Step 4
If you plan to install electrical interface assemblies (EIAs), continue with the
"NTP-H166 Remove the
Blank Sheet Metal Covers" procedure on page 1-9
to access the backplane. If not, continue with the
"NTP-H151 Install the Power and Ground" procedure on page
1-12.
Stop. You have completed this procedure.