Chapter 4
Turn Up a Network
b.
Step 21
Repeat Steps
If a node fails any test, repeat the test while verifying correct setup and configuration. If the test fails
Step 22
again, refer to the next level of support.
After all tests are successfully completed and no alarms exist in the network, the network is ready for
service application. Continue with
Stop. You have completed this procedure.
NTP-H33 Provision an Open-Ended Path Protection
Configuration
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
Verify that the fiber is correctly connected to the path protection optical ports at each open-ended path
protection node. For the ONS 15310-MA SDH,
ONS 15310-MA SDH Nodes 2 and 3 through Slot 3/Port 1-1 and Slot 4/Port 2-1. Optical ports on
15310E-CTX-K9 at Nodes 2 and 3 are connected to the third-party vendor equipment.
78-19416-01
Complete the
"DLP-H223 Export CTC Data" task on page 18-20
on your hard drive.
6
through
20
for each node on the network.
This procedure provisions ONS 15310-MA SDH nodes in an open-ended
path protection connected to a third-party vendor network. This topology
allows you to route a circuit from one ONS 15310 network to another
ONS 15310 network through the third-party network.
None
NTP-H26 Verify Node Turn-Up, page 4-2
As needed
Onsite
Superuser
Chapter 5, "Create Circuits and VC Low-order Path Tunnels."
Figure 4-3
shows an example. Node 1 is connected to
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
Before You Begin
to export condition data to a file
4-13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents