NTP-H129 Bridge and Roll Traffic

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete the
Step 1
node. If you are already logged in, continue with
As needed, complete the
Step 2
page
As needed, complete the
Step 3
Optical Circuit" task on page
As needed, complete the
Step 4
Routing" task on page 17-77
Manual Routing" task on page
Step 5
As needed, complete the
Optical Circuit" task on page
As needed, complete the
Step 6
Step 7
As needed, complete the
option. Delete a roll only if it cannot be completed or cancelled. Circuits may have a PARTIAL status
when this option is selected.
Stop. You have completed this procedure.
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
6-10
This procedure reroutes live traffic without interrupting service. You can
use the Bridge and Roll wizard for maintenance functions such as card
replacement or load balancing. A circuit consists of a source facility,
destination facility(s), and intermediate facilities (path).
None
As needed
Onsite or remote
Provisioning and higher
"DLP-H29 Log into CTC" task on page 16-43
"DLP-H183 Roll the Source or Destination of One Optical Circuit" task on
17-72.
"DLP-H184 Roll One Cross-Connect from an Optical Circuit to a Second
17-75.
"DLP-H185 Roll Two Cross-Connects on One Optical Circuit Using Automatic
or the
17-80.
"DLP-H187 Roll Two Cross-Connects from One Optical Circuit to a Second
17-82.
"DLP-H189 Cancel a Roll" task on page
"DLP-H188 Delete a Roll" task on page
Circuits must exist on the network. See
and VC Low-order Path Tunnels."
To route circuits on protected ports, you must create a protection group
using the
NTP-H142 Create Protection Groups for ONS 15310-MA
SDH, page
3-10.
When a roll involves two circuits, a data communications channel
(DCC) connection must exist. See the
DCC Terminations" task on page
Use the
"NTP-H69 Locate and View Circuits" procedure on page 6-2
to verify that the planned Roll To paths are in service. Verify that the
planned Roll To and Roll From paths are not in the Roll Pending status,
used in test access, or used in a loopback. Refer to the
Cisco ONS 15310-MA SDH Troubleshooting Guide to clear any
alarms.
Step
2.
"DLP-H186 Roll Two Cross-Connects on One Optical Circuit Using
Chapter 6
Chapter 5, "Create Circuits
for circuit creation procedures.
"DLP-H52 Provision Section
16-68.
at the ONS 15310-MA SDH circuit source
17-84.
17-84. Use caution when selecting this
Manage Circuits
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents