Figure 16-13 Installing The Sfp On The Ons 15310-Ma Sdh - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Move the bail clasp to the left to unlatch it before inserting it into the slot.
Step 4
Slide the SFP into the slot and move the bail clasp to the right to secure the SFP.
Step 5
Figure 16-13
SDH is similar. SFPs are installed on the faceplate of the 15310E-CTX-K9 card.)
Figure 16-13
Do not remove the protective caps until you are ready to attach the network fiber-optic cable.
Caution
Note
Return to your originating procedure (NTP).
Step 6
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-20
shows SFP installation on the ONS 15310-MA SDH. (Installation on the ONS 15310-MA
Installing the SFP on the ONS 15310-MA SDH
You must set the normalized optical power received (OPR) value whenever you replace or insert
an SFP. After you click Set for the port you are observing, the LBC (%), OPR (%), and OPT (%)
values under the Performance > Optical tabs should be close to 100 percent. Only
Cisco-approved SFPs should be used. See the
Parameter Thresholds for Optical Ports" procedure on page 9-2
changing optical port settings, and the
page 7-4
for more information about viewing performance monitoring parameters.
"NTP-H87 Modify Line Settings and PM
for more information about
"NTP-H66 Monitor Optical Performance" procedure on
Chapter 16
DLPs H1 to H99
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents