Dlp-H19 Install Fiber-Optic Cables For Path Protection Configurations - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Figure 16-14
Repeat Steps
Step 3
port pairs you want to place in a 1+1 configuration.
Return to your originating procedure (NTP).
Step 4

DLP-H19 Install Fiber-Optic Cables for Path Protection Configurations

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
You can install the fiber immediately after installing the node, or wait until you are ready to turn up the
Note
network. See
Plan your fiber connections. Use the same plan for all path protection nodes.
Step 1
Plug the fiber into the Tx port at one node and plug the other end of the fiber into the Rx port at the
Step 2
adjacent node. The card will display a signal fail (SF) LED if the transmit and receive fibers are
mismatched (for example, one fiber connects a receive port to a receive port, or a transmit port to a
transmit port).
Repeat
Step 3
Figure 16-15
(west) and Slot 12 (east).
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-22
Installing an Optical Cable in the ONS 15310-MA SDH
1
and
2
for the corresponding protect ports on the two nodes and all other working/protect
This task installs the fiber-optic cables to the east and west path protection
ports at each node. See
test path protection configurations.
Fiber-optic cables
NTP-H109 Clean Fiber Connectors, page 14-11
As needed
Onsite
None
Chapter 4, "Turn Up a Network."
Step 2
until you have configured the entire ring.
shows fiber connections for a four-node path protection with trunk (span) cards in Slot 5
Chapter 4, "Turn Up a Network"
Chapter 16
DLPs H1 to H99
to provision and
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents