Dlp-H7 Connect Dc Office Power To The Ons 15310-Ma Sdh; Figure 16-3 Installed Ac Power And Strain Relief Bracket - Cisco ONS 15310-MA SDH Procedure Manual

Hide thumbs Also See for ONS 15310-MA SDH:
Table of Contents

Advertisement

Figure 16-3
Return to your originating procedure (NTP).
Step 3

DLP-H7 Connect DC Office Power to the ONS 15310-MA SDH

Purpose
Tools/Equipment
Prerequisite Procedures Connect the office ground to the ONS 15310-MA SDH chassis. For detailed
Cisco ONS 15310-MA SDH Procedure Guide, Release 9.1 and Release 9.2
16-6
Installed AC Power and Strain Relief Bracket
This task connects DC power to the ONS 15310-MA SDH shelf.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Hand crimper (Molex P/N 63811-1100)
Fuse and alarm panel
Connector housing (Cisco P/N 29-5116-01 or Molex P/N 50-29-1608)
Connector terminal (Cisco P/N 27-1919-01 or Molex P/N 18-12-1602))
Power cable (from fuse and alarm panel to assembly), 14 AWG, stranded
(41 strands, 0.010 in.)
Listed pressure terminal connectors such as ring and fork types; 14 AWG,
stranded (41 strands, 0.010 in.)
instructions on grounding, refer to the
(ESD) and Grounding
Cisco ONS Electrostatic Discharge
Guide.
Chapter 16
DLPs H1 to H99
78-19416-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents