Gently route the fiber cables through the cable guides.
Step 2
Return to your originating procedure (NTP).
Step 3
NTP-B13 Perform the Shelf Installation Acceptance Test
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Complete
Step 1
Table 1-7
Description
NTP-B1 Unpack and Inspect the ONS 15327 Shelf Assembly, page 1-4
NTP-B2 Install the Shelf Assembly, page 1-5
NTP-B216 Install the Mechanical Interface Cards, page 1-11
NTP-B6 Install the Power and Ground, page 1-12
NTP-B7 Install the Fan-Tray Assembly, page 1-20
NTP-B217 Install the XTCs, page 1-21
NTP-B218 Install the Optical and Ethernet Cards, page 1-23
NTP-B8 Install Wires to Alarm, Timing, LAN, and Craft Pin Connections, page 1-28
NTP-B220 Install the Electrical Cables, page 1-33
NTP-B221 Install Optical Cables, page 1-40
Step 2
Check each wire and cable connection to make sure all cables are locked securely. If a wire or cable is
loose, return to the appropriate procedure in this chapter to correct it.
Complete the
Step 3
Stop. You have completed this procedure.
Cisco ONS 15327 Procedure Guide, R4.0
1-48
Use this procedure to perform a shelf installation acceptance test.
Voltmeter
Chapter 1, "Install Hardware"
Required
Onsite
Retrieve or higher
Table 1-7 on page 1-48
by verifying that each procedure was completed.
ONS 15327 Shelf Installation Task Summary
"DLP-B33 Measure Voltage" task on page
Chapter 1
1-49.
Install Hardware
Completed
March 2003

Advertisement

Table of Contents
loading

Table of Contents