NTP-B6 Install the Power and Ground
Attach the other end of the shelf ground cable to the rack.
Step 3
Return to your originating procedure (NTP).
Step 4
DLP-B17 Connect Office Power to the ONS 15327 Shelf (Screw-Lock Power
Connector)
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Do not apply power to the ONS 15327 until you complete all installation steps and check the continuity
Warning
of the -48 VDC and return.
Caution
Before you make any crimp connections, coat all bare conductors (battery, battery return, and frame
ground) with an appropriate antioxidant compound. Bring all unplated connectors, braided strap, and bus
bars to a bright finish, then coat with an antioxidant before you connect them. You do not need to prepare
tinned, solder-plated, or silver-plated connectors and other plated connection surfaces in this manner, but
always keep them clean and free of contaminants.
You must install this power connector if you plan to install the right-angle DS-1 cable.
Note
Cisco ONS 15327 Procedure Guide, R4.0
1-14
This task connects power to the ONS 15327 shelf. You must install this
power connector if you plan to install the right-angle DS-1 cable.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Wire wrapper
Wire cutters
Wire strippers
Crimp tool
Fuse panel
Screw-lock power connector
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper
conductors, 194°F [90°C])
Ground cable #6 AWG stranded
Listed pressure terminal connectors such as ring and fork types; connectors
must be suitable for #10 AWG copper conductors
DLP-B16 Connect the Office Ground to the ONS 15327, page 1-13
Required
Onsite
None
Chapter 1
Install Hardware
March 2003