Install Hardware
Verify that the proper fuse panel is installed (20-amp fuse per shelf minimum). If not, install one
Step 1
according to manufacturer's instructions.
Complete the
Step 2
Complete the
Step 3
Connector)" task on page
Complete the
Step 4
Complete the
Step 5
Step 6
Continue with the
Stop. You have completed this procedure.

DLP-B16 Connect the Office Ground to the ONS 15327

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Verify that the office ground cable (#6 AWG stranded) is connected to the top of the rack according to
Step 1
local site practice.
Attach one end of the shelf ground cable (#10 AWG) to the ground connection point located on the
Step 2
left-hand side panel as you face the ONS 15327.
Note
March 2003
"DLP-B16 Connect the Office Ground to the ONS 15327" task on page
"DLP-B17 Connect Office Power to the ONS 15327 Shelf (Screw-Lock Power
1-14.
"DLP-B18 Turn On and Verify Office Power" task on page
"DLP-B30 Install Ferrites on Power Cabling" task on page
"NTP-B7 Install the Fan-Tray Assembly" procedure on page
This task connects ground to the ONS 15327 shelf.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
Screws
Power cable (from fuse and alarm panel to assembly), #10 AWG, copper
conductors, 194°F [90°C])
Ground cable #6 AWG stranded
Listed pressure terminal connectors such as ring and fork types; connectors
must be suitable for #10 AWG copper conductors
NTP-B216 Install the Mechanical Interface Cards, page 1-11
Required
Onsite
None
When terminating a frame ground, use the kep-nut provided with the ONS 15327 and tighten it
to a torque specification of 31 in-lbs. The kep-nut provides a frame ground connection that
minimizes the possibility of loosening caused by rotation during installation and maintenance
activity. The type of prevention the kep-nut provides for the frame ground connection is
inherently provided by the terminal block for battery and battery return connections.
NTP-B6 Install the Power and Ground