ABB IRB 8700 Series Product Manual page 749

Hide thumbs Also See for IRB 8700 Series:
Table of Contents

Advertisement

3
4
5
Performing a leak-down test
1
Preparations before refitting the motor
1
2
3
Product manual - IRB 8700
3HAC052853-001 Revision: F
Action
Refit the hub.
Remove the two M6x110 and fit the attach-
ment screws for the hub.
Apply locking liquid (Loctite 243) on the
screws.
Note
The number of attachment screws differ
depending on gearbox.
Secure the hub.
Action
Perform a leak-dowm test.
Action
DANGER
Make sure that all supplies for electrical power,
hydraulic pressure, and air pressure are turned
off.
Remove old paint residues and other contamina-
tion from the contact surfaces on both motor and
gearbox.
Wipe clean the contact surfaces from any remain-
ing contamination.
Also wipe clean the o-ring groove.
© Copyright 2015-2018 ABB. All rights reserved.
4.8.4 Replacing the axis-3 gearbox
Note
xx1500002326
Attachment screws: M6x30 12.9.
Loctite 243
Quantity:
Axis-1 = 6 pcs
Axis-2 = 8 pcs
Axis-3 = 8 pcs
Axis-4 = 4 pcs
Axis-5 = 6 pcs
Axis-6 = 4 pcs
Tightening torque: 14 Nm.
Note
See
Performing a leak-down test on
page
184.
Note
Continues on next page
4 Repair
Continued
749

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700-550/4.20Irb 8700-800/3.50Irc5

Table of Contents