ABB IRB 8700 Series Product Manual page 333

Hide thumbs Also See for IRB 8700 Series:
Table of Contents

Advertisement

5
6
7
Refitting the axis-5 gearbox side
1
Product manual - IRB 8700
3HAC052853-001 Revision: F
Action
Refit the support shaft.
Refit and secure the support shaft with
screws and washers.
Secure the bearing.
Action
Refitting of the axis-6 unit must start with
the turning disc facing upwards. When the
last screws are attached, the axis-5 shall
be as close as possible to +90° position.
© Copyright 2015-2018 ABB. All rights reserved.
4.5.3 Replacing the axis-6 unit
Note
xx1600000199
Attachment screws, M12x55 (12 pcs)
Tightening torque: 120 Nm
xx1600000198
Attachment screws: M8x16 (6 pcs)
Tightening torque: 24 Nm
xx1600000197
Note
Continues on next page
4 Repair
Continued
333

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700-550/4.20Irb 8700-800/3.50Irc5

Table of Contents