ABB IRB 8700 Series Product Manual page 347

Hide thumbs Also See for IRB 8700 Series:
Table of Contents

Advertisement

Removing the process turning disk
1
2
3
4
5
6
Refitting the process turning disc
Use these procedures to refit the process turning disk.
Refitting the process turning disk
1
2
3
4
5
Product manual - IRB 8700
3HAC052853-001 Revision: F
Action
DANGER
Make sure that all supplies for electrical
power, hydraulic pressure, and air pressure
are turned off.
CAUTION
The process turning disk weighs 50 kg. All
lifting accessories must be sized accord-
ingly.
Attach the a roundsling to the process
turning disk and to an overhead crane (or
similar).
Stretch the lifting accessories to take the
weight of the process turning disk.
Unscrew the 22 attachment screws and
washers that secure the process turning
disk.
Remove the process turning disk.
Action
CAUTION
The process turning disc weigh 50 kg. All
lifting accessories must be sized accord-
ingly.
Attach a roundsling to the process turning
disk and to an overhead crane (or similar).
Wipe clean the contact surfaces.
Make sure the process turning disk is refit-
ted in the correct position.
Secure the process turning disk with its
attachment screws and washers.
© Copyright 2015-2018 ABB. All rights reserved.
4.5.5 Replacing the process turning disc
Note
Roundsling 1 m: Lifting capacity: 1,000 kg
Note
Roundsling 1 m: Lifting capacity: 1,000 kg
Attachment screws: M12x40 12.9 Gleitmo
603 (22 pcs)
Tightening torque: 120 Nm
Continues on next page
4 Repair
Continued
347

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Irb 8700-550/4.20Irb 8700-800/3.50Irc5

Table of Contents