12.3.
Operation Monitoring
12.3.1. Operating Information
You can check the robot work time, battery usage time, etc.
From the project tree, double click the target project [Online] → [Monitor] → [Operation Monitor] →
[Operating Information].
You can initialize the battery remaining time with [Maintenance] → [Initialize]. For details on operation methods,
see "13.2.4 Initializing the battery remaining time".
12.3.2. Production Information
You can check the latest tact time, run time, cycle count, and average tact time for each program in the robot
controller. The latest tact time, run time, and average tact time can be measured up to 1193 hours (about 49
days).
From the project tree, double click the target project [Online] → [Monitor] → [Operation Monitor] → [Production
Information].
The production information is not constantly updated. Click the [Refresh] button as necessary.
12-247
Figure 12-36 Operating Information
Figure 12-37 Production Information
12-247