Right Hand Counterbalance Valve Installation - Toro 22317 Service Manual

Wheeled compact utility loader, chain drive/4-paw gas/4-paw diesel
Hide thumbs Also See for 22317:
Table of Contents

Advertisement

4-PAW GAS/HYDRAULICS
33. Transfer 4 of the 6 hydraulic fittings from the old
counterbalance valve to the new counterbalance
valve (Fig. 1037).
Note: The 2 spool fittings do not get transferred.
They come with the new counterbalance
valve.
Counterbalance Valve Assembly (Fig. 1038).
A
B
A. Bolt
B. Washer (2)
C. Counterbalance valve
5/2-18
Fig. 1037
DSC-1067a
E
D
B
C
Fig. 1038
DSC-1010a
D. Spacer
E. Nut
Right Hand Counterbalance Valve
Installation
Note: Upon removal, all seals, o-rings and gaskets
should be replaced. During installation, lightly
lubricate all seals, o-rings and gaskets with
clean petroleum jelly prior to assembly.
1. Position the counterbalance valve inside the frame.
2. Loosely install the bottom hydraulic hard line nut
(Fig. 1039).
3. Loosely install the top hydraulic hard line nut (Fig.
1040).
Toro Wheeled CUL Service Manual
Fig. 1039
DSC-1070a
Fig. 1040
DSC-1072a

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

223112230022304223022230322305 ... Show all

Table of Contents