Download Print this page

GE LOGIQ E9 Service Manual page 74

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
Section 3-2
Setup reminders
3-2-1
Average setup time
Table 3-1
DICOM NETWORK CONFIGURATION
3-2-2
Setup warnings
WHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE OF OPENING THE
DANGER
AC GROUND LINE (I.E., METER'S GROUND SWITCH IS OPEN), DON'T TOUCH
THE UNIT!
TO PREVENT ELECTRICAL SHOCK, CONNECT THE UNIT TO A PROPERLY GROUNDED
CAUTION
POWER OUTLET. DO NOT USE A THREE TO TWO PRONG ADAPTER. THIS DEFEATS SAFETY
GROUNDING.
DO NOT WEAR THE ESD WRIST STRAP WHEN YOU WORK ON LIVE CIRCUITS AND MORE
CAUTION
THAN 30 V PEAK IS PRESENT.
DO NOT OPERATE THIS UNIT UNLESS ALL BOARD COVERS AND FRAME PANELS ARE
CAUTION
SECURELY IN PLACE. LOGIQ E9 PERFORMANCE AND COOLING REQUIRE THIS.
If the unit is very cold or hot, allow the temperature of the device to stabilize before powering up. The
following table describes guidelines for reaching operational temperatures from storage or transport
temperatures. See:
3 - 2
5
EV
Average setup time
DESCRIPTION
UNPACKING THE LOGIQ E9
SET UP LOGIQ E9 WO/OPTIONS
INSTALL INSITE / ILINK
2-2-2 "Console environmental requirements" on page
Section 3-2 - Setup reminders
AVERAGE SETUP
TIME
0.5 HOUR
4 HOURS
DEPENDENT ON THE CONFIGURATION
2 HOURS OR MORE
DEPENDENT ON THE CONFIGURATION
0.5 HOUR
LOGIQ E9 Service Manual
COMMENTS
2-2.

Advertisement

loading