Download Print this page

GE LOGIQ E9 Service Manual page 424

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-6-2-4
LCD Monitor V2 installation (used in R4.x and later production)
Table 8-17
1.
WHEN INSTALLING THE LCD TO THE
ARM, KEEP THE LCD ARM ASSEMBLY
IN THE LOCKED POSITION. THE
SPRINGS TO SUPPORT THE LCD CAN
CAUSE THE ARM TO SPRING OPEN
CAUSING SEVERE PERSONAL INJURY
AND PROPERTY DAMAGE.
Keep the LCD supported and mate the flat
surfaces of the LCD Arm to the flat surfaces
of the LCD mounts.
Install the LCD Arm Assembly to the LCD
with the two M5x20 screws and spring
"lock" washers removed. Torque: 9.8 Nm
(7.2 lbf-ft {86.7 lbf-in}).
2.
The LCD Cable to LCD is secured to the
LCD with a retaining screw (1), an EMC
shielded retainer (2) and two phillips
screws (3).
Remove the screws and retainer, if present
or re-install the Cable into LCD and tighten
the screw (1).
Install the retainer and secure with the two
M4X12 screws (3).
8 - 60
5
EV
LCD Monitor V2 installation (used in R4.x and later production)
Steps
WARNING
WARNING
Section 8-6 - Replacing Top Console Parts
LOGIQ E9 Service Manual
Corresponding Graphic

Advertisement

loading