Download Print this page

GE LOGIQ E9 Service Manual page 557

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-10-4-4-4
4D MC Reinstallation for Lambda PS
Table 8-97
1.
Install the two screws (circled),
supplied with the replacement 4D MC
to secure the 4D MC to the 4D MC
Cover.
NOTE: The replacement 4D MC
includes a two USB Cables, the longer
USB Cable must be used for a Lambda
PS.
Connect the long USB Cable to the 4D
MC. Route the cable as shown.
Insert the 4D MC and cover into the PS,
2.
along the mounting rails (circled).
NOTE: There are four mounting rails,
two at the top (circled) and two in the
bottom. Make sure all are aligned to
ensure the 4D MC connects to the
Lambda PS. The 4D MC connects
directly to the Lambda PS.
5
EV
4D MC Reinstallation for Lambda PS
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
8 - 193

Advertisement

loading