Download Print this page

GE LOGIQ E9 Service Manual page 588

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8.
Mount the transmitter and tighten the
transmitter mounting screws (A) on the arm
and route the cable through the cable
management channels (B), in the under-
side of the arms. The arm is showed in the
stowed position.
While supporting the arm (loaded with the
transmitter), slowly loosen the knob which
allows the arm to gradually move down the
channel.
NOTE: The arm must move down the
channel very slowly when the knob is
loosened, and it must move easily upward
when lifting. If the arm free-falls or will not
move, follow the adjustment procedure,
see:
Mechanism" on page
8-12-6
Adjusting Tension on Sliding Mechanism
1.
Remove the plastic bolt cap from the lower
tension nut.
The clamping knob must be unlocked while
making this adjustment. Using the 1/2 inch
socket wrench, loosen or tighten the
tension nut for the desired tension.
8 - 224
Section 8-12 - V Nav Roll Stand and/or On-Board Stand Installation and/or Replacement
5
EV
Table 8-110 Option Installation to LOGIQ E9
Steps
8-12-6 "Adjusting Tension on Sliding
8-224.
Table 8-111 Adjusting Tension on Sliding Mechanism
Steps
LOGIQ E9 Service Manual
Corresponding Graphic
Corresponding Graphic
Plastic Bolt Cap for tension nut and Unlocking
Clamping Knob

Advertisement

loading