Download Print this page

GE LOGIQ E9 Service Manual page 439

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-6-6-2
Upper OP Panel/Touch Panel Assembly installation
Table 8-30
1.
Connect the cables to the Operator Panel, Upper.
Do not stretch on the Ribbon Cable. If stretched, the connector on Operator Panel, Lower may
break, resulting in a malfunction.
Ribbon Cable from the Operator
1
Panel, Lower
Trackball Cable from the Operator
2
Panel, Lower
A/N Cable from the A/N Keyboard
3
Bulkhead Board USB Cable 1
4
(from bulkhead position closest to
the OP) in position J24
Be careful not to pinch any of the cables when installing the Upper OP Panel/Touch Panel Assembly.
NOTICE
5
EV
Upper OP Panel/Touch Panel Assembly installation
Steps
NOTICE
Chapter 8 Replacement procedures
Corresponding Graphic
Bulkhead Board USB Cable 2 (from
5
bulkhead position furthest from the
OP) in position J25
USB Cable 1 (part of Main Cable) in
6
position J21
USB Cable 2 (part of Main Cable) in
7
position J22
Power/On-Off switch (part of Main
8
Cable) in position J23
LOGIQ E9 Service Manual
8 - 75

Advertisement

loading