Download Print this page

GE LOGIQ E9 Service Manual page 543

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-10-2-5
Main PS installation
NOTE:
If the 4D MC option was installed, make sure to reinstall the option into the new replacement
PS.
Table 8-90
1.
Make sure the GFI PCIe cable is routed
behind the Main PS fang. GFI
Configuration only. MRX does not use this
cable.
Slide the Main PS (1) forward to seat the
connectors (2) on the Card Cage.
Engage the tab onto the Fang (see Step 1).
Install the three screws (3) that secure the
Main PS using a 5 mm Allen wrench
(Torque: 10 Nm {7.4 lbf-ft}).
5
EV
Main PS installation
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
8 - 179

Advertisement

loading