Download Print this page

GE LOGIQ E9 Service Manual page 506

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
Table 8-59
5.
Release the lock connector for the BEP to
Backplane cable, J2 (left) on a MRX
Configuration.
Or, the Backplane cable, J3 (right) and J5
PCIe to the Card Rack on a GFI
Configuration, using a BEP6. Keep the
cable to transfer to the replacement BEP.
6.
Slide:
• the entire BEP away from the system approximately one inch, then finish removing the printer
bracket.
• the entire BEP out of chassis and remove the BEP from the system.
7.
Remove the following parts from the BEP, to reinstall in the replacement BEP:
• Option Dongle
• Printer Bracket
• BackPlane to BEP cable
• Wireless Card and Antennas, if present)
• Patient I/O, if present)
• S Video Card, if present)
8 - 142
5
EV
BEP removal - R4.x and later
Steps
Section 8-9 - BEP (Back End Processor) parts replacement
Corresponding Graphic
BEP Cable to Backplane, J2 - BEP6
BEP Cable to Backplane J3 of GFI Configuration
(view inside the BEP)
LOGIQ E9 Service Manual

Advertisement

loading