Download Print this page

GE LOGIQ E9 Service Manual page 568

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-11-6-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-11-6-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes you removed earlier.
2.) Power up the system to verify that it operates as intended.
3.) Test the Print Keys to confirm they function as they did before.
4.) Perform a test print.
8-11-6-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required checks and is ready for use.
See
Section
4-2-3
4-2-4
4-3-15
4-3-20
10-8-3
10-8-4
8 - 204
5
EV
Table 8-102 Black and White Digital Graphic Printer replacement Functional
Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
Mechanical Function Checks
Grounding continuity
Chassis Leakage Current Test
Section 8-11 - Peripherals replacement
Debrief Script
LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Leakage Current measured at
(record the value) and meets allowable limits.
Equipment passed all required checks and is
ready for use.
LOGIQ E9 Service Manual

Advertisement

loading