Download Print this page

GE LOGIQ E9 Service Manual page 394

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-5-2-6
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-5-2-7
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes you removed earlier
2.) Power up the system to verify that it operates as intended.
8-5-2-8
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required checks and is ready for use.
See
Section
4-2-3
4-2-4
4-3-15
4-3-6
4-3-8
4-3-20
4-3-20-2
8 - 30
5
EV
Table 8-3
Side Covers replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Mechanical Function Checks
Brakes and Direction Lock Checks
Section 8-5 - Replacing Covers and Bumpers
Debrief Script
LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required
checks and is ready for use.
LOGIQ E9 Service Manual

Advertisement

loading