Download Print this page

GE LOGIQ E9 Service Manual page 541

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-10-2-4
Main Power Supply removal
NOTE:
This procedure addresses the two types of Main Power Supplies (Cherokee/Mitra and Lambda)
used in the LOGIQ E9.
Table 8-89
1.
To remove Main PS (1):
NOTE: The mounting of a Cherokee/Mitra
PS and Lambda PS are the same. The PS
connectors are in different locations.
NOTE: When the system is in standby, the
Lambda PS will be warm. This is normal for
a Lambda PS.
Disconnect the Mains PS Cable and all
cables (2) - AC Output to Peripherals,
Printer, Power to BEP and USB on top of
the Main PS.
Remove the three screws (3) that secure
the Main PS using a 5 mm Allen wrench.
Ease the Main PS away from the fang
bracket (4).
Pull/slide the entire Main PS backwards
until the connectors to the Card Cage/
Backplane are unseated.
NOTE: If the 4D MC option is installed,
proceed to Step 2. If not proceed to Step 3.
5
EV
Main Power Supply (PS) removal
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
Main PS and mounting
(Cherokee/Mitra) PS connectors
(Lambda) PS connectors
8 - 177

Advertisement

loading