8-8-2
Front Casters replacement
8-8-2-1
Manpower
One person, 15 minutes.
8-8-2-2
Tools
For tools needed, refer to:
8-8-2-3
Preparations
When preparing for the replacement, you must perform the following steps:
1.) Power down the system
2.) Disconnect the mains power cable from the wall outlet.
3.) Disconnect all Probes and External I/O Cabling.
4.) Remove both Side Covers.
5.) Remove the Foot Rest Bumper.
Follow these links if you need more information:
4-2-4 "Power shut down" on page 4-7.
8-5-2-4 "Side Covers removal" on page 8-28.
8-5-4 "Foot Rest Bumper replacement" on page 8-33.