Download Print this page

GE LOGIQ E9 Service Manual page 587

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
5.
Position the Arm Stand Post (1) onto the
Stand Mounting Plate (4). Install two of the
six screws (5), at the top first. DO NOT
tighten completely. Install the remaining
screws loosely.
Tighten in a sequence. Top front, bottom
rear and center. Then the remaining, in a
sequence. Torque: 9.8 Nm
(7.2 lbf-ft {86.7 lbf-in}).
6.
Insert the Track Cover into the Track Cover
groove and slide it the lowest position to
cover the Stand mounting access holes.
7.
Fasten the Cover Plate (2) to the top of the
post (1) with the four SHCS (3) as shown.
Repeat step for the bottom Cover Plate, if
not previously installed.
5
EV
Table 8-110 Option Installation to LOGIQ E9
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
}
3
2
1
8 - 223

Advertisement

loading