Download Print this page

GE LOGIQ E9 Service Manual page 510

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-9-3-3
Calibration and adjustments
Calibrate the Front End as described in:
8-9-3-4
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Verify that all screws that you removed earlier have been installed.
2.) If finished, connect cables and Probes removed earlier.
3.) Power up the system to verify that it operates as intended.
8-9-3-5
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required checks and is ready for use.
See
Section
4-2-3
4-2-4
4-3-15
4-3-6
4-3-8
4-3-20
1.) Check/Set Date, Time, and Timezone, and set the Preset Region accordingly.
2.) Reconnect to the network.
3.) If the system was connected to InSite ExC, restore the service settings backed up prior to the base
load. Reboot and verify remote connectivity.
4.) Confirm Patient Archive images, Report Archive, User Defined Configuration (Customer Presets),
and Service settings are restored.
5.) Format a DVD, and backup Customer Presets to confirm proper CD/DVD write functionality.
8 - 146
5
EV
Table 8-61
BEP replacement Functional Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
B-Mode Checks
System CFM and PWD Checks
Mechanical Function Checks - internal
and external
Perform a 4D sweep
Diagnostics
Section 8-9 - BEP (Back End Processor) parts replacement
Section 6-4 "DC Offset Calibration" on page 6-8.
Debrief Script
LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required
checks and is ready for use.
LOGIQ E9 Service Manual

Advertisement

loading