Download Print this page

GE LOGIQ E9 Service Manual page 410

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-5-10-1
Calibration and adjustments
No calibrations or adjustments are needed after this part replacement.
8-5-10-2
Verification
Perform the following steps to verify that the product is functioning as intended after this replacement:
1.) Connect cables and Probes you removed earlier
2.) Power up the system to verify that it operates as intended.
3.) LCD Arm and LCD Monitor movement functions in all directions without the covers loosening.
8-5-10-3
Functional Checks
Perform the following functional checks to confirm the system is operational before returning the system
to the customer.
If all are successful, include the following debrief script: LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required checks and is ready for use.
See
Section
4-2-3
4-2-4
4-3-15
4-3-20
4-3-20-2
8 - 46
5
EV
Table 8-8
LCD Monitor V2 Arm Assembly Covers replacement Functional
Checks
Functional Check
Power ON/Boot Up
Power shut down
Probe/Connectors Checks
Mechanical Function Checks
Brakes and Direction Lock Checks
Section 8-5 - Replacing Covers and Bumpers
Debrief Script
LOGIQ E9 Service Manual, Direction 5180263-
100, Rev 5. Equipment passed all required
checks and is ready for use.
LOGIQ E9 Service Manual

Advertisement

loading