Download Print this page

GE LOGIQ E9 Service Manual page 344

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
7-5-23
Patient I/O Tests
Under Service Diagnostics / Patient I/O.
This procedure provides a basic test of the ability of the system to start and stop the acquisition of data
from the Patient I/O Module to the Host via the GFI.
INPUT > The connection of ECG leads, PHONO (PCG) or AUX is optional.
OUTPUT > The results display information about the signal data acquired from the ECG input to the
Patient I/O Module. The information includes the minimum signal value, maximum signal value and
mean signal value.
If this test fails:
1.) Run GFI tests
If GFI is ok:
2.) Replace Patient I/O module
If this test passes and there are still issues with poor or no ECG trace, replace ECG leads.
7 - 100
5
EV
Section 7-5 - Common Service Desktop
LOGIQ E9 Service Manual

Advertisement

loading