Download Print this page

GE LOGIQ E9 Service Manual page 554

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
Table 8-95
2.
Attach the new 4D MC Cover and route
the USB Cable as shown.
Use the P-Clamp, Screw and Washer
supplied with the 4D MC replacement to
secure the USB Cable to the PS.
4.
Install the five screws (circled) to secure
the 4D MC Cover to the Main PS. Make
sure the P-Clamp for the 4D MC USB
Cable is not twisted. It should be aligned
with the Main PS.
5.
Check that the GFI PCIe Cable is behind
the Main PS fang (1). GFI Configuration
only. MRX does not use this cable.
Put the Main PS into position so it will be
ready to be mounted.
Feed the USB cable from the Main PS,
between the BEP and the Targa frame
and then feed the USB cable through the
gap prior to fastening the Main PS to the
Targa frame.
Check that the GFI PCIe cable between
the rear of the Card Cage (2) and the
Targa frame (3).
NOTE: If applicable; only on GFI Card
Rack configuration.
8 - 190
5
EV
4D MC Reinstallation for Cherokee/Mitra PS
Steps
Section 8-10 - Main Power Supply parts replacement
LOGIQ E9 Service Manual
Corresponding Graphic
Side view of the PCIe Cable routed
between the Card Cage and Targa.

Advertisement

loading