Download Print this page

GE LOGIQ E9 Service Manual page 101

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
3-6-9
Complete power down (cont'd)
Figure 3-17 System - Exit menu (R1.x.x)
Figure 3-18 System - Exit menu (R2.x.x and R3.x.x)
2.) Select Shutdown to do a complete power down of the unit.
The Back End Processor will first turn off the LOGIQ E9 activity and print the message "Please wait
- Shutdown in progress in the LCD display on the Operator Panel.
Next, it starts to shut down itself. The time to turn down the unit, including the Back End Processor,
may vary from 10 seconds up to approximately 1 minute.
The last thing that shuts down, is the light on the Operator Panel, indicating that you can continue
with the next step.
Be sure to wait with the next step until the system has finished its shut-down. Failing to do so, may
NOTICE
destroy data on the Hard Disk Drive, making the system fail later.
3.) Switch off the Mains Power Circuit Breaker, located on the rear of the unit. This will cut power
distribution within the unit.
5
EV
Chapter 3 LOGIQ E9 Setup
LOGIQ E9 Service Manual
3 - 29

Advertisement

loading