Download Print this page

GE LOGIQ E9 Service Manual page 507

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-9-3-2
BEP installation
Table 8-60
1.
Disconnect:
• the battery cable from PCN1.
• the CB to PB cable from PCN2.
Place the BEP cover aside.
2.
Re-install the following parts into the replacement BEP:
• Option Dongle
• Printer Bracket
• BackPlane to BEP cable
• Wireless Card and Antennas, if present)
• Patient I/O, if present)
• S Video Card, if present)
3.
Slide the BEP into the left side of the chassis frame.
4.
Install the two HEX key screws at the inside
base of the BEP (Torque: 10 Nm
{7.4 lbf-ft}).
5
EV
BEP installation
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
BEP6 CB cables
8 - 143

Advertisement

loading