Download Print this page

GE LOGIQ E9 Service Manual page 547

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-10-3-4
Main Power Supply Fan Assembly removal (cont'd)
Table 8-92
1.
Prepare the replacement Fan Assembly
for installation.
Identify the connector for fan 1 (a). Fan 1
connector is identified with a black
marking. Fan 1 (a) is the fan on the right
side of the Fan Assembly (as shown).
If there are no tie wraps attached, attach a
tie wrap (b) to the connector cables to
position the cables in the center of Fan 2
(c). Trim the end of the tie wrap.
NOTE: The tie wraps are necessary to
position the cables between the heatsink
and the module when the Fan Assembly is
placed into the PS.
2.
Position the Fan Assembly under the PS
(as shown), to ease connecting the
connectors to the PS.
Connect the Fan Assembly connectors to
PS the fan terminals:
NOTE: Fan 1 must be connected to the
terminal labeled X14 (circled). Terminal
X14 supplies the voltage to the stand-by
fan (Fan 1) and also the regular operating
voltage to Fan 1, once the system is
turned on.
· Fan 2 or 3 to the terminals labeled X12 or
X13
· Fan 1 to terminal labeled X14
5
EV
Installing the replacement Fan Assembly
Step
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
8 - 183

Advertisement

loading