Download Print this page

GE LOGIQ E9 Service Manual page 281

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
7-5-10
Slidepots Tab
Test the slidepot (TGC) functionality by moving each slidepot through its range. See: Figure 7-35. Verify
that the visual and numeric position of the slide pot are updated as the slide pot is moved.
Test the LED for each slide pot by pressing on the LED buttons. See: Figure 7-35. Visually verify the
LED functionality on the upper operator panel.
5
EV
Figure 7-35 Slidepots Tab
Chapter 7 Diagnostics/Troubleshooting
LOGIQ E9 Service Manual
7 - 37

Advertisement

loading