Download Print this page

GE LOGIQ E9 Service Manual page 533

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
8-9-8-2
BEP Battery Pack installation
Table 8-83
1.
Route the battery cable through the cable opening into the BEP and position the BEP Battery
Pack into place.
2.
Install the stabilizing foam strip beside the Battery Pack.
3.
Install the Battery Pack Cover and the four screws that secure the Battery Pack Cover to the BEP
cover. Tighten screws securely.
4.
Loosen the thumb screws or screws at the top of the BEP cover that attach the cover to the BEP.
Tilt the top of the BEP cover away from the BEP.
5.
Connect the Battery cable to J3 on the EPS.
6.
Make sure all cables are clear of the BEP Cover and tilt the top of the BEP cover toward the BEP.
Be careful not to pinch any of the cables when installing the BEP cover.
7.
Tighten and secure the thumb screw(s) at the top of the BEP cover, or the three screws that
attach the cover to the BEP.
8.
Replace the side cover.
9.
Perform Functional Checks. See:
8-9-7-4 - Verification
NOTE:
ALL batteries MUST BE recycled or disposed of in accordance with local, state, or country laws.
5
EV
installation
Steps
NOTICE
and
Chapter 8 Replacement procedures
8-9-9-3 - Calibration and
8-9-9-5 "Functional Checks" on page
LOGIQ E9 Service Manual
Corresponding Graphic
adjustments,
8-174.
8 - 169

Advertisement

loading