Download Print this page

GE LOGIQ E9 Service Manual page 705

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
10-6-7
Isolated patient lead (source) leakage-lead to ground
Equipment damage possibility. Never switch the Polarity and the status of Neutral when the
CAUTION
system is powered ON. Be sure to turn the system power OFF before switching them using the
POLARITY switch and/or the NEUTRAL switch. Otherwise, the system may be damaged.
10-6-7-1
Definition
This test measures the current which would flow to ground from any of the isolated ECG leads. The
meter simulates a patient who is connected to the monitoring equipment and is grounded by touching
some other grounded surface.
Measurements should be made under the test conditions specified in:
Table 10-9 on page 10-11
Table 10-10 on page 10-11 as applicable.
For each combination the operating controls, such as the lead switch, should be operated to find the
worst case condition.
5
EV
Chapter 10 Care & Maintenance
LOGIQ E9 Service Manual
10 - 17

Advertisement

loading