Download Print this page

GE LOGIQ E9 Service Manual page 559

Hide thumbs Also See for LOGIQ E9:

Advertisement

GE H
EALTHCARE
D
5180263-100, R
IRECTION
Table 8-97
Connect the USB Cable from the
6.
4D MC to J28 on the BEP.
7.
Check that the GFI PCIe Cable is
behind the Main PS fang (1).
Put the Main PS into position so it will
be ready to be mounted.
Feed the USB cable from the Main PS,
between the BEP and the Targa frame
and then feed the USB cable through
the gap prior to fastening the Main PS
to the Targa frame.
Check that the GFI PCIe cable
between the rear of the Card Cage (2)
and the Targa frame (3).
NOTE: If applicable; only on GFI Card
Rack configuration.
7.
Install the Rear Cover and Side Covers.
Record VPD information for 4D Motor Controller. For information on updating VPD, see:
8-4-7-2 "Verify and Update Vital Product Data" on page
5
EV
4D MC Reinstallation for Lambda PS
Steps
Chapter 8 Replacement procedures
LOGIQ E9 Service Manual
Corresponding Graphic
Side view of the PCIe Cable routed
between the Card Cage and Targa.
8-25.
8 - 195

Advertisement

loading