Ntp-B78 Create A Monitor Circuit - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

NTP-B78 Create a Monitor Circuit

NTP-B78 Create a Monitor Circuit
Purpose
Tools/Equipment
Prerequisite Procedures Bidirectional (2-way) circuits must exist on the network. See
Required/As Needed
Onsite/Remote
Security Level
Monitor circuits cannot be used with EtherSwitch circuits.
Note
For unidirectional circuits, create a drop to the port where the test equipment is attached.
Note
Log into an ONS 15327 node on the network where you will create the monitor circuit. See the
Step 1
"DLP-B60 Log into CTC" task on page 2-23
Step 2.
From the View menu choose Go to Network View.
Step 2
Click the Circuits tab.
Step 3
Step 4
Choose the bidirectional (2-way) circuit that you want to monitor and double-click it (or click Edit).
Step 5
Verify that the circuit name is no more than 44 characters. Monitor circuits append a "_MON" to the
circuit name. If the name is longer than 44 characters, edit the name in the Name field, then click Apply.
Step 6
On the Edit Circuit window, click the Monitors tab.
The Monitors tab displays ports that you can use to monitor the circuit.
Note
On the Monitors tab, choose the monitor source port. The monitor circuit will display traffic coming into
Step 7
the node at the port you choose.
Click Create Monitor Circuit.
Step 8
In the Circuit Destination section of the Circuit Creation wizard, choose the destination node, slot, port,
Step 9
STS, VT, or DS1 for the monitored circuit.
Click Next.
Step 10
On the Circuit Routing Preferences panel, review the monitor circuit information. If you want the
Step 11
monitor circuit routed on a BLSR protection channel, click Protection Channel Access.
Click Finish.
Step 12
On the Edit Circuit window, click Close. The new monitor circuit appears on the Circuits tab.
Step 13
Stop. You have completed this procedure.
Cisco ONS 15327 Procedure Guide, R4.0
8-16
Use this procedure to create a monitor circuit that monitors traffic on
primary, bidirectional circuits.
None
"Create Circuits and VT Tunnels"
As needed
Onsite or remote
Provisioning or higher
The Monitor tab is only available when the circuit has an ACTIVE status.
for circuit creation procedures.
for instructions. If you are already logged in, continue with
Chapter 8
Manage Circuits
Chapter 5,
March 2003

Advertisement

Table of Contents
loading

Table of Contents