Dlp-B33 Measure Voltage - Cisco ONS 15327 Procedure Manual

Hide thumbs Also See for ONS 15327:
Table of Contents

Advertisement

Chapter 1
Install Hardware

DLP-B33 Measure Voltage

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Using a voltmeter, verify the office ground and power shows the power terminals):
Step 1
a.
b.
Using a voltmeter, verify the shelf ground and power wiring:
Step 2
a.
b.
Return to your originating procedure (NTP).
Step 3
March 2003
This task measures power so you can verify correct power and returns.
Voltmeter
NTP-B6 Install the Power and Ground, page 1-12
Table 1-7 on page
Required
Onsite
None
Place the black lead (positive) on the frame ground on the rack. Hold it there while completing
Step
b.
Place the red lead (negative) on the fuse power points and alarm panel to verify that they read
between -42 VDC and -57 VDC (power) and 0 (return ground).
Place the black lead (positive) on the RET1 and the red lead on the BAT1 point. Verify a reading
between -42 VDC and -57 VDC. If there is no voltage, check the following:
Battery and ground reversed to the shelf
Battery is open or missing
Return is open or missing
Repeat
Step 2
for the RET2 and BAT2 if the B power feed is provided.
NTP-B13 Perform the Shelf Installation Acceptance Test
1-48.
Cisco ONS 15327 Procedure Guide, R4.0
1-49

Advertisement

Table of Contents
loading

Table of Contents