NTP-B169 Set Up CTC Network Access
c.
After entering ONS 15327 OSPF area data, click Apply.
Step 8
If you changed the Area ID, the XTC cards will reset, one at a time. The reset will take approximately
10 to 15 minutes.
Return to your originating procedure (NTP).
Step 9
DLP-B251 Set Up or Change Routing Information Protocol
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Step 1
From node view, click the Provisioning > Network > RIP tabs.
Check the RIP Active check box if you are activating RIP.
Step 2
Choose either RIP Version 1 or RIP Version 2 from the pull-down menu, depending on which version is
Step 3
supported in your network.
Set the RIP metric. The RIP metric can be set to a number between 1 and 15 and represents the number
Step 4
of hops.
By default, RIP is set to No Authentication. If the router that the ONS 15327 is connected to requires
Step 5
authentication, complete the following steps. If not, continue with
a.
b.
c.
The authentication button label changes to Simple Password.
Cisco ONS 15327 Procedure Guide, R4.0
3-12
Retransmit Int (sec)—Sets the time that will elapse before a packet is resent. Five seconds is the
–
default.
Dead Int (sec)—Sets the number of seconds that will pass while an OSPF router's packets are
–
not visible before its neighbors declare the router down. Forty seconds is the default.
Click OK.
Table 3-1 on page 3-15
This task enables routing information protocol (RIP) on the ONS 15327.
Perform this task if you want to include the ONS 15327 in RIP-enabled
networks.
None
DLP-B60 Log into CTC, page 2-23
You need to create a static route to the router adjacent to the ONS 15327 if
the ONS 15327 needs to communicate its routing information to non
DCC-connected nodes.
As needed
Onsite or remote
Provisioning or higher
Click the No Authentication button.
On the Edit Authentication Key dialog box, complete the following:
Type—choose Simple Password.
–
Enter Authentication Key—Enter the password,
–
Confirm Authentication Key—Enter the same password to confirm it.
–
Click OK.
shows the LED behavior during the XTC reset.
Step
Chapter 3
Turn Up Node
6.
March 2003